Financial Services
Life cycle costing, CAPEX / OPEX estimations, Construction Estimates, IRR
Financial Consulting Services
Capital expenditure modelling
Operational expenditure modelling
Net present value and payback analysis
Maintenance and operational cost analysis
Whole life cost modelling
Asset renewal analysis
Financial Services
We have undertaken a number of financial evaluations and in addition to our portfolio of financial modelling services, we have arranged successful grant funding through the South African Department of Trade and Industry’s Capital Projects Feasibility Programme, as well as other investment partners.
We can also assist with the application for any mineral resource project (Mines Work Programmes) as well as water use licenses and mining permits. Our feasibility study experience ranges from desktop and scoping studies, to bankable feasibility and definitive studies.
Financial Services include but are not limited to:
- FEASIBILITY STUDIES – Concept scoping; Feasibility and bankable studies.
- FUNDING SOLUTIONS – Grant funding; Export credit funding; Debt and equity solutions.
- QUANTITY SURVEYING – Bills of quantities; Progress measurements; Interim and final payment certificates; Budget & estimates.
- COST MANAGEMENT
Design and construction programs; Progress updates; Budget and progress report.
Project showcase

Bel-Air Bauxite Mine Guinea
Project:
Bankable Feasibility Study Funding Application
A number of feasibility studies had been completed by Nurizon during 2013 for a bauxite mine development in the Republic of Guinea close to the town of Bel-Air. The project reached a stage where funding was required to complete a further bankable feasibility study (BFS).

Karoo Gateway Airport Upgrade
Project:
Airport Upgrade: Detail Design
As part of an EPC appointment, Nurizon was tasked to upgrade the existing Karoo Gateway Airport, located in Beaufort West South Africa, to accommodate flight school training operations. Nurizon was familiar with the site and had previously undertaken concept designs as part of an earlier project (and for a different client), in which domestic airline operations were the main driver for the upgrade concept.

Elandspruit Coal Mine
Project:
Mine Development: Feasibility Study and Owner's Team Representation
Nurizon was contracted by the client to complete a feasibility study, addressing all civil, mining and electrical infrastructure designs, as well compiling a financial model for a new greenfields coal mine in Mpumalanga, South Africa.
Project Continued:
Front-end Infrastructure Development: Detail Design
A site to the east of Delmas, part of the Central Witbank Coal Field, was identified by the client for the development of a new open cast coal mine. It was estimated that the reserve would yield approximately 3 million tonnes of coal annually, with an estimated lifespan of 20 years.